Fence installation in Dallas–Fort Worth

Cedar, board-on-board and horizontal. Built inside your property line, to city and HOA code, with a written scope before you pay anything.

Long run of new dog-ear wood privacy fence

What we build

Long run of new dog-ear wood privacy fence

Cedar privacy

The standard across DFW, and for good reason. Cedar handles Texas heat and resists rot and insects without chemical treatment.

Board-on-board cedar fence with a cap rail along a side yard

Board-on-board

Boards overlap on both sides of the rail. No gaps as the wood moves in summer, and it looks finished from your side and your neighbor's.

Horizontal wood privacy fence

Horizontal

Cleaner and more modern. Needs tighter post spacing and straighter lumber than a standard vertical fence, so it costs more to do right.

Braced wood double gate with black strap hinges

Gates

Walk gates and drive gates, plus straightforward automatic gate installation. For heavily customized automation, we'll tell you up front if it's outside what we do.

Do you actually need an 8-foot fence?

Usually not. Height is the fastest way to add cost to a fence, and a lot of the time a 6-foot fence gives you the same privacy for less. It depends on the slope of your yard and where your house sits relative to the neighbors'. On a lot that falls away from the house, six feet can screen more than eight feet does on flat ground.

We'll walk it and tell you which one your yard actually needs. Sometimes it's eight. Often it isn't.

Where concrete matters on a post, and where you're just paying for concrete

Concrete placed correctly holds a post. More concrete in the wrong place doesn't hold it better. It just costs more and takes longer to cure. The same goes for a lot of the add-ons that get quoted: extra trim pieces, decorative caps, additional boards low on the fence for pets. Most of those change how the fence looks, not how long it stands.

If you want them for the look, that's a real reason and we'll build them. We just won't sell them to you as strength.

What your fence is going to do in the first year, so it doesn't surprise you

New cedar changes color more in the first twelve months than in the rest of its life. It goes from that fresh orange-tan to a silvery gray, and it does it unevenly depending on sun exposure. That's normal and it isn't a defect.

One thing to watch: if a sprinkler head sprays directly onto a section of fence, that section will weather and need staining sooner than the rest. Either adjust the head or plan on maintaining that run on a shorter cycle. We'll point out any spots we see on the walkthrough.

Property lines, neighbors and HOA

Every post, panel and rail we install goes inside your lot line. We build to city code and to your HOA's requirements, and we'd rather find a problem before the posts are set than after.

If the fence is on a shared line, talk to your neighbor before we start. We'll give you the scope drawing to show them. It's a five-minute conversation that prevents a very expensive one.

How a job goes

  1. You reach out.

    Call, text or the form. You hear back within 24 hours.

  2. We walk the yard.

    We listen to what you want before we talk about what it costs.

  3. You get the PDF.

    Written scope, inclusions, exclusions, price.

  4. Permits and materials.

    We start on approvals immediately and order anything with a lead time.

  5. We build.

    Then we walk it with you.

Recent work

Gallery
Horizontal cedar fence on steel posts along a street
Horizontal cedar fence on steel posts
Board-on-board cedar fence with a cap rail along a side yard
Board-on-board cedar fence with cap rail
Cedar drive gate on a steel frame
Cedar drive gate on a steel frame
Braced wood double gate with black strap hinges
Braced wood double gate
Long run of new dog-ear wood privacy fence
Dog-ear privacy fence
Wood privacy fence with three-rail framing
Privacy fence with three-rail framing

Questions

How much does a fence cost in DFW?

Installed cedar privacy fencing runs across a wide range in this market depending on height, board style, wood grade, post material, gates and how much your yard slopes. That range is wide enough that two honest quotes can differ significantly. We walk the property, then you get a written number with the scope behind it.

Cedar or pine?

Cedar resists rot and insects naturally and holds up better in Texas heat. Pine costs less up front and needs more consistent staining to get close to the same life. Many builds use treated pine posts with cedar boards, since the posts are the part underground.

Do I need a permit?

It depends on the city and the height. We confirm the requirement for your address and handle the submittal.

When should I stain a new fence?

Not immediately. New wood needs to dry out first. We'll tell you the window for your specific build.

Do you remove the old fence?

Yes, and the debris goes with us. It's a line item on your estimate so you can see it.

Do you stain or repair existing fences?

Yes. We stain and repair existing fences, not just build new ones.

Cost, timeline, insurance

What does a project cost?

Depends on size, materials and what your yard is doing. Cedar privacy fence, concrete patio and pergola all sit in wide ranges across DFW, and any contractor who gives you a firm number without walking the property is guessing. We walk it, then you get a written number that doesn't move.

Will you come down on price?

The number is the number. If it's more than you want to spend, we'll change the scope. Fewer feet, a different finish, pine instead of cedar, and we re-quote it honestly. We don't discount, because a price that moves when you push it was never a real price.

How long will it take?

The build itself is usually days, not weeks. What moves the calendar is permitting, which takes a few days to two weeks depending on the city, and HOA review, which runs on their schedule. We start on both immediately and order long-lead materials the same day.

Do I need a permit?

Often, especially for anything attached to the house or with electrical. We confirm the requirement for your address and handle the submittal.

Doing more than one thing?

Adding a deck at the same time? Most of our fence customers are thinking about the rest of the yard too, and doing both at once means one crew, one schedule and one point of contact. See decks

Tell us what you're thinking about.

No pressure, no sales rep. You'll talk to the people who run the job.

Get your free estimate

We answer within 24 hours. Every time, even if it's to tell you we're not the right fit.